![]() |
|
|
|
Projects Advanced ventilation system improves efficiency and sustainability. Engineering design for addition and remodeling. New refrigeration system uses 50% less energy than old system. Minnesota Geothermal Heat Pumps Performance, emissions, economic analysis of MN geothermal heat pumps. La Crosse, WI Housing Authority 13 energy audits completed in La Crosse, WI. New high-performance HVAC system yielded $36k in savings. Study and retrofit of whey drying system achieved $12k/year savings. Retrofit of glycol pumping system helped save $19k/year.
|
|
|
|
© 2008 Michaels Engineering Inc. All rights reserved. |
||